1. Begin by inspecting the hydraulic control valves and other fittings to make sure they are not leaking.
2. Start the tractor and ensure the three-point hitch and all hydraulic lift links are in the fully lowered position.
3. Lift the loader and support it with jack stands while it is raised to the required height.
4. Place the loader arms into the correct position on the tractor frame.
5. Measure the height of the loader frame from the tractor frame using a tape measure.
6. Lower the loader and adjust the lift links and the three-point hitch if it is necessary to level the loader frame.
7. Once the loader is leveled, take note of the placement for the lift link and three-point hitch so that it can be re-adjusted if needed in the future.
8. Check the manual for specific maintenance directions for your particular model Massey Ferguson front loader.