1. Disconnect all hydraulic hoses that are connected to the loader. Remove all hydraulic fluid from the loader as well.
2. Mark the two hose connections that are located on the gland body before removal. Disconnect the two bolts located on the gland body and remove the gland.
3. Place the new gland body into position and make sure it is lined up with the two hose connections. Secure the two bolts that were removed earlier.
4. Reconnect the hydraulic hoses. Fill the loader with hydraulic fluid and check for any leaks.